Communicate with Supplier? Supplier
Wang Mr. Wang
What can I do for you?
Contact Supplier
 Tel:86-0531-69901036 Email:sales@sdzeyu.cn
Home > Industry Information > Hot sale hzs concrete batching plant
Online Service
Wang

Mr. Wang

Leave a message
Contact Now

Hot sale hzs concrete batching plant

2020-07-03

Concrete Mixer operation flow

First, before starting, you should carefully inspect the various parts of the mechanical system and confirm that it is good enough to start.

Second, before starting, the stirring lever should be placed in the "neutral" position.
Third, after the start, the stirring lever should be placed in the "unloading" position and the water in the cylinder should be drained.
Fourth, when loading, stirring rod should be placed in the "loading" position.
5. Before transport, the unloading tank must be fixed in the “traveling” position to prevent swinging.
6. When operating the joystick, stop at the “neutral” position before moving to the next position.
7. Do a good job of civilized construction. Excess materials in the barrel must not be allowed to fall. After the unloading, the mixing drum, feed trough, idler and other parts must be cleaned.

8. When the person enters the barrel to clear the agglomeration, the vehicle shall be turned off, the key of the switch shall be removed, and the peripherals shall be monitored.


Related Products List

Home

Phone

Skype

Inquiry